Zone 1

ZONE 1 (CHERAS BATU 11)

Quick Facts on Zone 1

No of Manhole 141
Depth Min: 2.6m
Max: 20.6m
Total Length Pipe Network 11 Km
Total No STP Rationalized 25 Nos.

Pipelines Sizes

       

225 mm∅ VCP

       

300 mm∅ VCP

       

450 mm∅ RCP

       

600 mm∅ RCP

       

750 mm∅ RCP

       

900 mm∅ RCP

       

1050 mm∅ RCP

       

1200 mm∅ RCP

       

1500 mm∅ RCP

       

1800 mm∅ RCP

       

2100 mm∅ RCP

       

Small Treatment Plant (STP)

VIEW ANIMATION MAP VIEW LARGER MAP